For applications that require real money to build the renovation works, how to not make timid? In the "2014 looking for home improvement home improvement assured Engineering and 2014 safety project selection activity" in progress we combine consumer feedback, and industry experts, supervisors summed renovated 15 meter, to help you easily get home improvement. 
Consider the layout of a house 
"Know thyself, know yourself." We must first understand their own house, measuring about actual housing area, especially the area tiling, wall paint area, wall area, floor area, etc.. After the amount of their own room, you can prevent some irregular or foreman lot area, to seek illegitimate interests wpc decking. 
2 early design and planning functions 
Draw a simple diagram of a house, want to think about the structure of the original house how to make adjustments. According to family members living habits, living functional areas necessary for how to divide the family, to determine the location and furniture outlet size on home infrastructure have a basic judgment. Also, take into account future changes in the family lifestyle. 
3 for the home improvement program 
Home improvement construction process can be divided into: first Chaigai walls or re-drywall; then converted hydropower, piping. After the second step hydropower acceptance, carpentry approach, mason be waterproof kitchen walls and tiling. After the completion of the third step woodworking is wood varnish and ceiling surfaces, walls Pihui, paint brush. The top surface of the wall after the fourth step process to start leveling the ground, floor tile or wood floors.
Finally, install sanitary ware, lamps. The entire renovation will be completed, the entire duration of approximately 50 days, if the project has a large decrease in the corresponding period of change. 
4 fitting way to determine in advance 
Currently there are three modes decoration. First, consumers buy decoration materials, construction worker delegate. This approach requires consumers renovation process, the required materials and building materials market is very familiar with, and plenty of time to do all manner of call. The second is the "Light Accessories", that consumers bring their own part of the main material, such as floor tiles, ceramic tiles, sanitary ware, decorative auxiliary company responsible for procurement and construction, such as cement, lime, paint, water and electricity transformation. In this way the relative peace of mind, consumers can choose according to the economic strength of the main material and preferences go to the market. The third is the decoration "packages", from the construction to the main material, and even furniture, completely renovated by the company "agent" for effort in no time, decoration materials and engineering for people who do not understand this approach takes a relatively high number of , the selection is relatively small where can buy composite sheets. 
5 Select ease Supervision 
Currently there are two types of home improvement market supervision: a type of third-party supervision of the company's independent operation supervision, and the other one is the interior decoration company supervision department supervision (inspection). Interior decoration project supervision owned by the company management, adjustable and basic contradictions independent home improvement company will have supervision of qualified audit decoration company designs, construction techniques, and so on supervision. 
6 pick decoration company 
Consumers can go to any one decoration business consulting, negotiation, or go to the home improvement exhibitions understanding. To investigate whether the company has a legitimate home improvement business license and a certificate of qualification should have architectural engineering construction, formal office locations. Companies can choose to decorate the model occasionally visited the site to learn more about decoration company level.

7 visits Designers
Note that there are no qualified designers examine qualifications and appointment card. The best use of "a look at two of three comparative listening" approach, a look at the designer before the design work; two designers spatial pattern of the division of the house; compare three different designers to make different designs. 
8 signed a formal contract 
Regular brand home improvement company will be signed by the Beijing Industry and Commerce Bureau and the Construction Committee printed in home improvement construction contracts with consumers, rather than standardized enterprise consumers do not understand the situation and will be relied on to replace it with a contract to develop its own text. As a result, there would have been the main responsibility is not clear, rights and obligations of the parties are not clear, changes in project not included in the contract, quality acceptance criteria, such as non-compliance occurs. 
9 pegged contract details 
A more complete home improvement project contract in addition to the budget, design drawings, construction process should also include key construction projects, construction plans and materials of both parties, such as purchase orders. In addition, the parties to the contract renovation, including the construction period of the change, the subject of the contract, construction projects, etc., should be confirmed in writing; as an annex to the contract for the construction of the main material quotations, should be specific and clear as possible, listed decoration material specifications, models, brand, quantity, unit price, total price and so on wholesale deck. 
10 good project budget 
Select the "all-inclusive" decoration patterns, consumers are more effort, but the cost is relatively higher; choose "semi-inclusive" decoration mode, you can even buy the main and auxiliary materials from the building materials market, but need to have enough time and patience. Moreover, the choice of construction renovation team than to choose a home improvement company, provincial part of the management fee, taxes, but the use of poor materials, construction quality, but off the danger, when consumers choose to weigh. 
11 Note retained reprint 
Complex process of renovation, decoration consumers to buy the main material, pay attention to reprint documents retained, including the renovation and decoration company signed a contract, water lines wiring diagram, the main material auxiliary product test reports, a fee for each receipts or invoices, etc., on the one hand in order to protect their legitimate rights and interests when disputes arise in the future, on the other hand, if the latter needs repair and renovation of these documents are also necessary guarantees. 
12 Property and neighbors to communicate better 
Renovated old house in a mature community in general, a lot of trivial things to note. Before renovation, the cell floor and door stickers good "decoration notices", and neighbors, property and timely communication, to avoid complaints; decoration garbage bags into the designated storage location must be handled by the property contact the sanitation unit, if the property is not responsible for dealing with garbage, we need to clean up consumer trust decoration companycheap hard patio surfaces. 
13 Comprehensive Evaluation drawings 
First, the design was beautiful to look at, this directly reflects the designer's aesthetic standards. Secondly, drawings and text descriptions and detailed characterization or not. Third, drawing program can be successfully implemented. Fourth, drawing content meets their requirements. 
14 tests, stare good site 
In the whole process of home renovation, field tests, is the most crucial step. Generally by the client, designers, project supervision, foremen and skilled workers mainly involved in all tests, should reach the construction site, the designer responsible for the construction, engineering and management staff to explain in detail the design and construction process requirements, and the need attention, supervision and coordination of the project run by a variety of procedures. 
15 tenements transformation rational planning 
Before renovation work must do advance wiring, appliances where to do what needs to be placed ahead of plan, the old house is generally reserved for switches and sockets are not enough. Generally, a room set up at least three outlets, a good number of outlets within two bedroom house less than 15, less than eight switches.